We didn have a Gantt chart, because we didn need one.我们没有绘制甘特图,因为我们并不需要它。
The Gantt chart in Part 1 outlined our Phase 1 work packages.第1部分中的甘特图描述了我们第1阶段的工作任务包。
Plans are always documents, don fall into the trap of thinking that, for example, a Gantt chart is a plan - its only a schedule diagram.计划通常是文件。不要陷入陷阱,例如,认为一张甘特横道图是一个计划,它仅仅是一张进度表而已。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。