上部矿仓
上部矿仓
该装置解决了高温且物料流速较慢的矿槽料位上、下限检测的技术问题。
The principle of it is:When the upper level is reached, the rotary valve and bin gate will start in turn to discharge.其控制原理为:当上料位信号出现时,卸灰电机、闸板阀开始工作,进行排灰。
The upper material level meter and the lower material level meter are installed on the aggregate bin.上料位仪和下料位仪安装在集料斗上。