引黄
引黄
万家寨引黄工程主要为大同市、平朔区、太原市提供工业用水。
Based on increasing water-saving force further, the sewage treatment of various industrial economic departments and diversion from Yellow River must be stressed.要深度解决太原市缺水问题,应实行开源节流与污染治理并举的措施,在进一步加大节水力度的基础上,增大污水处理回用和引黄力度。
Using hydraulic model, the writers studied the process and pattern of sediment deposit in high pressure water conveyance pipe of Wanjiazhai YRDP (Yellow River Diversion Project).作者采用模型试验方法研究了万家寨引黄工程高压输水管道中泥沙的淤积过程、形态,分析了临界不淤流速及管道淤堵等问题。