该机构还报道,一项针对粗劣建筑是否造成了损失的加剧的调查正在进行之中。
In the case of a slightly negligent a condition which goes to the root of the contract, Contractor shall be liable only for reasonably foreseeable damage which is intrinsic to the contract.倘若仅仅是对合同基本条款轻微的违反,承包方应仅对合理的、可预见的、合同实质上的损失承担责任。